Heavy Duty Trucking Logo
MenuMENU
SearchSEARCH

WattEV to Open Charging Depot at Port of Long Beach

The WattEV public charging depot will serve heavy-duty electric trucks with routes connecting to inland destinations throughout Southern California.

WattEV to Open Charging Depot at Port of Long Beach

The WattEV depot, located adjacent to the Pier-A terminal in the Port of Long Beach, features 5 mW capacity for concurrent charging of 26 trucks at up to 360kW each.

Photo: WattEV

3 min to read


Electric transportation developer WattEV has completed its 26-truck charging plaza at the Port of Long Beach and is preparing to take delivery of 14 Nikola Tre battery-electric trucks.

WattEV is building public charging depots to serve fleets of commercial electric trucks. But the company also provides electric trucks as a service to meet the needs of shippers and fleet operators committed to meeting California’s mandates towards zero-emissions. 

Ad Loading...

WattEV’s first of four charging depots in Southern California will open for service at the Port of Long Beach with access to Interstate 710 and 110 starting the week of May 15. Nikola trucks can use the WattEV depots for daily charging.

WattEV CEO Salim Youssefzadeh says his company aims to reduce charging times significantly. 

“We have been running a pilot test with Nikola battery-electric trucks for the past six months and are quite satisfied with the energy efficiency of the trucks and the ongoing technical support," he said. "Nikola’s customer-centric approach to meet our requirement for transition from CCS to MCS charging will be a game changer, which will allow us to rapidly expand our fleet size,” Youssefzadeh said.  

Ad Loading...

The Combined Charging System (CCS) is the current charging standard for heavy-duty e-trucks, while faster charging systems are under development. The higher-power Megawatt Charging System is expected to become the worldwide standard for fast-charging of medium- and heavy-duty commercial vehicles, reducing the typical charge sessions to less than 30 minutes.

More About the WattEV Charging at Long Beach Port

The plaza's public opening will follow the Volts Conference, a charging infrastructure event taking place May 9-10 in Long Beach, sponsored by the California Energy Commission, hosted by the North American office of the Charging Interface Initiative, known as CharIN, with testing provided by WattEV.

Branded as WattEV, the depot will serve heavy-duty electric trucks with routes connecting to inland destinations throughout Southern California. The facility will support its first batch of 14 Nikola electric trucks with the fleet expected to expand to about 100 electric trucks by the end of 2023, with the opening of additional charging depots in Southern California. 

Test Drive: Nikola Tre BEV Truck is Off to an Exciting Start

According to WattEV, the Port of Long Beach charging depot is designed to serve electric truck operations throughout the San Pedro Bay ports complex. It's the first of several WattEV electric truck charging depots in the works throughout California, including warehouse districts in nearby Gardena and inland near San Bernardino.

"This charging station is the southern anchor of our planned electric-truck charging freight corridor, which will incrementally connect to all the major freight routes throughout California, Oregon, Arizona, and Nevada," said Salim Youssefzadeh, CEO of WattEV, in a statement. "Our truck-charging depot at the Port of Long Beach is a major step towards enabling transporters to transition to zero-emission trucking."

Ad Loading...

The ports have been setting clean air goals for about 20 years with a goal of having 100% zero-emission trucks serving the ports by 2035.

On opening, WattEV's Port of Long Beach e-truck charging plaza will feature 26 charging bays using Combined Charging System (CCS) connectors to provide power at up to 360kW. When trucks with megawatt charging capability become available, four more pass-through e-truck bays will be added, which will feature the higher-power Megawatt Charging System, rated for charging at up to 1.2 megawatts, reducing charge sessions for medium and heavy-duty commercial vehicles to less than 30 minutes.

More Fuel Smarts

Video still of Volvo's Duane Tegels explaining the Volvo D13 diesel engine for EPA 2027 emissions
Equipmentby Deborah LockridgeSeptember 16, 2026

How Volvo Updated Its D13 for EPA 2027 [Watch]

Volvo’s updated D13 promises lower emissions without sacrificing performance or fuel economy. Take a closer look at what changed inside the engine in this HDT Spotlight video.

Read More →
Collage of fuel options for trucks - renewable diesel, renewable natural gas, diesel, and electric
Fuel Smartsby StaffSeptember 15, 2026

Diesel Price Spike Shortens Payback for Natural Gas Trucks, Report Says

Energy Vision estimates fleets could recover the higher purchase price of an RNG-fueled Class 8 tractor in 1.3 to 2.8 years under current fuel-price scenarios.

Read More →
Illustration showing the Calstart, Forth, and Catalyst Mobility logos
Fuel Smartsby StaffSeptember 14, 2026

Calstart Becomes Catalyst Mobility, Reflecting Broader Focus

Calstart is now Catalyst Mobility, reflecting the nonprofit’s growing national role in clean transportation, including zero-emission trucks, infrastructure and incentive programs.

Read More →
Ad Loading...
Illustration with oil wells, dollar bills, and a diesel fuel pump
Fuel SmartsSeptember 9, 2026

Record Diesel Prices Squeeze Trucking Fleets

Average U.S. diesel prices have climbed to nearly $6 a gallon, surpassing the 2022 record as tight refinery capacity and Middle East disruptions keep fuel costs elevated.

Read More →
A red engine part
SponsoredSeptember 9, 2026

How Fuel Delivery Shapes Engine Performance

Fuel delivery depends on more than what happens at the injector. For fleet, maintenance and technical professionals, looking at the full path from pump to injector can provide useful context for understanding engine performance.

Read More →
Port of Newark EV truck charging station.
Equipmentby News/Media ReleaseSeptember 8, 2026

East Coast Port Launches $45M Electric Truck Push

The Port Authority of New York and New Jersey announced millions in incentives for zero-emission drayage trucks, yard tractors, and new charging hubs near the port.

Read More →
Ad Loading...
Fuel Smartsby StaffAugust 31, 2026

California Bill Could Shed Light on Electric Truck Prices

Why do battery-electric Class 8 trucks remain so expensive? A California bill headed to Gov. Gavin Newsom would give fleets and state agencies more visibility into what manufacturers charge.

Read More →
Illustration of Freightliner Cascadia on highway with engine cutaway
Equipmentby Deborah LockridgeAugust 27, 2026

Detroit Opens Orders for EPA 2027 Engines

Detroit isn’t starting from scratch to meet EPA 2027 diesel emissions standards. Its Gen 6 DD13 and DD15 engines keep much of today’s platform while updating the fuel and aftertreatment systems.

Read More →
Group of people and zero-emission trucks during ceremony announcing a West Coast ZEV corridor.
Fuel Smartsby News/Media ReleaseAugust 26, 2026

Zero-Emission Truck Corridor Planned for West Coast

California, Oregon, Washington, British Columbia and Baja California are coordinating plans for truck charging and hydrogen fueling from Canada to Mexico.

Read More →
Ad Loading...
YouTube thumbnail showing Kenworth T880e electric truck and KW marketing director Kyle Kimball.
Equipmentby Deborah LockridgeAugust 25, 2026

A Closer Look at Kenworth’s Electric T880E Vocational Truck [Video]

Learn more about Kenworth's T880E battery-electric vocational truck at the Paccar Technical Center, including its range, applications, upfitting considerations, and PTO options, in this HDT Spotlight video.

Read More →