Section of I-24 Closed in Nashville This Weekend
Tennessee Department of Transportation contract crews will close a 3-mile section of I-24 near downtown Nashville this weekend and more throughout the summer as the state replaces two aging bridges

These photos show deterioration of the I-24 bridges that are being repaired.
Tennessee Department of Transportation contract crews will close a 3-mile section of I-24 near downtown Nashville this weekend and more throughout the summer as the state replaces two aging bridges.
The repairs are part of an $8.7 million project to rehabilitate bridges that were built in 1961. The
project will require the total closure of a section of I-24 for 13 weekends this spring and summer.
Instead of shutting down the interstate for several months, TDOT is using an innovative method to rehabilitate this bridge, Accelerated Bridge Construction (ABC). Using this method, 277 concrete panels weighing from 3.5 to 11.5 tons have already been created and will be dropped into the bridges then tied together. This is similar to the way a puzzle works. During the process, drivers might experience some rough driving surface, but that will be repaired in time. Due to deteriorated concrete and problems in the old bridge deck, the entire 9-inch bridge deck will be removed and replaced.
Interstate 24 eastbound and westbound will be closed from the I-24/I-65 split north of downtown Nashville to the I-24/I-40 split east of downtown beginning Friday, May 4 at p.m. The interstate will open no later than Monday, May 7 at 5 a.m.
In addition, Main Street and Woodland Street, from South 5th Street to Interstate Drive, will be closed to perform bridge repairs. Detours will be in place.
Drivers passing through downtown Nashville will follow detour signs instructing them to take the west loop (I-40/I-65) around downtown. Project closures and detour maps are available at www.tdot.state.tn.us/i24bridges/maps.shtml. A new East Nashville specific map, along with other maps to access downtown has recently been added.
All work is weather dependent.
The interstate will be shut down Fridays at 9 p.m. and reopened Mondays at 5 a.m. Due to three major events at LP Field and Memorial Day weekend, the interstate WILL NOT be closed the weekends of April 27-29, May 25-28, June 7-10, and June 22-24. Construction is estimated to be completed on or by August 31, 2012.
For more information on TDOT construction project activity visit the TDOT SmartWay web site at
www.tn.gov/tdot/tdotsmartway/.
More Drivers

When Language Stops the Truck: The Return of ELP Out-of-Service Orders
English language proficiency rules for commercial drivers aren’t new, but renewed out-of-service enforcement has raised the stakes. Here’s what carriers need to know before a driver reaches a roadside inspection.
Read More →
Samsara Launches Custom AI Agent Builder
Agent Studio lets fleets create AI tools for hours-of-service monitoring, reporting and driver support, including agents that communicate by phone.
Read More →
Trucker Path Expands Reserved Parking Network
Trucker Path has added close to 6,000 more truck parking spaces to its Trucker Path Reserved Parking Network with the addition of Safe Truck Parking.
Read More →
EEOC Sues Texas Trucking Company Over Driver Age Limits
The agency says Trancasa USA rejected applicants over 65 and applied tougher driving-record standards to those over 60.
Read More →
Nussbaum, Roehl Announce Second Driver Pay Increase This Year
This year has seen a swath of major truck driver pay increases as freight capacity has tightened.
Read More →
From One Generation to the Next: How Mentorship Builds Safer Truck Drivers
After three decades in trucking, Harold Perry shares what he's learned about driver safety, mentorship, and helping the next generation build confidence behind the wheel.
Read More →
Truck Drivers Need More Than Another Alert
Fleets have more visibility into truck health, safety events, and driver activity than ever. The next challenge is turning all that information into useful guidance for the person who has to decide what to do next.
Read More →
FMCSA Removes 110 Truck Driver Training Schools from Certified ELDT List
Federal regulators also are targeting more than 160 additional training providers and launching a nationwide audit of third-party CDL skills testers as part of a broader crackdown on trucking fraud.
Read More →
Hours of Service Pilot Programs: FMCSA Readies for 2027 Rollout
Two pilot programs could eventually reshape hours-of-service rules, giving truck drivers options to pause their 14-hour clock or use longer split sleeper rest periods.
Read More →
Medical Cards, English Proficiency Reshape Roadcheck Violations
Medical-card violations jumped to the top of the driver out-of-service list during CVSA’s 2026 International Roadcheck, while English-language proficiency violations appeared among the leading violations for the first time.
Read More →
