I-5 South to See Full Freeway Closures Sept. 11-14
The California DOT is conducting a series of brief, intermittent, full freeway closures in the early morning hours on northbound and southbound Santa Ana Freeway (I-5) between Valley View Avenue and Carmenita Road through Friday, Sept. 14, from 1 a.m. to 5 a.m
The California DOT is conducting a series of brief, intermittent, full freeway closures in the early morning hours on northbound and southbound Santa Ana Freeway (I-5) between Valley View Avenue and Carmenita Road through Friday, Sept. 14, from 1 a.m. to 5 a.m.
The work involves relocating utility lines across the freeway. Southern California Edison will perform the work, with Caltrans oversight, as part of the I-5 HOV Widening and Carmenita Road Interchange Project.
California Highway Patrol will conduct traffic breaks for these full closures. Each full freeway closure - three or four per night in each direction - will last approximately 10 to 12 minutes and are scheduled to take place at hourly intervals. The nightly schedule is as follows:
- Tuesday, September 11 at 1 a.m. to 5 a.m.
- Wednesday, September 12 at 1 a.m. to 5 a.m.
- Thursday, September 13 at 1 a.m. to 5 a.m.
Northbound I-5
The traffic breaks will occur just before Valley View Avenue. Motorists have the option to exit at Valley View Avenue and re-enter northbound I-5 at the Rosecrans Avenue on-ramp.
Closed Ramps:
Northbound I-5 on-ramp at Alondra Boulevard will be closed at all times.
Northbound I-5 on-ramp at Valley View Ave. will be closed intermittently to coincide with mainline closures.
Southbound I-5
The traffic breaks will occur just before Carmenita Road. Motorists have the option to exit at Carmenita Road and re-enter the southbound I-5 on-ramp at the Valley View Avenue.
Closed Ramps:
The southbound I-5 on-ramp at Carmenita Road will be closed at all times.
The closures are weather-permitting and are subject to cancellation. uggested detours will be posted.
The I-5 South Corridor Improvement Projects will construct one carpool and one general purpose lane in each direction, realign and upgrade adjacent frontage roads, and reconstruct bridges from the Los Angeles/Orange County line to Interstate 605. Two projects are currently in construction: Carmenita Road Interchange ($380 million), and the Alondra Boulevard Bridge ($110 million).
By 2013, six corridor-widening projects will be in construction simultaneously.
Information about the I-5 South Corridor Improvement Projects is available from the toll-free I-5 Hotline 855-454-6335 or www.I-5info.com.
More Drivers

FDA Eases Path for Oral-Fluid Testing
Federal actions could advance oral-fluid drug testing for truck drivers, but lab certification delays and marijuana rescheduling questions remain.
Read More →
Why Hiring Truck Drivers Is Getting Harder
Higher recruiting costs, a shrinking driver pool, and renewed pay competition are raising the stakes for fleets heading into 2027.
Read More →
Roehl Offers Truck Drivers $10,000 Retention Incentive
Payments begin after the first load and continue in mileage-based installments for eligible experienced drivers joining the fleet.
Read More →
Platform Science Adds Dispatch and Safety Tools
Four additions to PS Fleet help fleets monitor loads, manage driver coaching, share truck locations and adjust video system settings.
Read More →
When Language Stops the Truck: The Return of ELP Out-of-Service Orders
English language proficiency rules for commercial drivers aren’t new, but renewed out-of-service enforcement has raised the stakes. Here’s what carriers need to know before a driver reaches a roadside inspection.
Read More →
Samsara Launches Custom AI Agent Builder
Agent Studio lets fleets create AI tools for hours-of-service monitoring, reporting and driver support, including agents that communicate by phone.
Read More →
Trucker Path Expands Reserved Parking Network
Trucker Path has added close to 6,000 more truck parking spaces to its Trucker Path Reserved Parking Network with the addition of Safe Truck Parking.
Read More →
EEOC Sues Texas Trucking Company Over Driver Age Limits
The agency says Trancasa USA rejected applicants over 65 and applied tougher driving-record standards to those over 60.
Read More →
Nussbaum, Roehl Announce Second Driver Pay Increase This Year
This year has seen a swath of major truck driver pay increases as freight capacity has tightened.
Read More →
From One Generation to the Next: How Mentorship Builds Safer Truck Drivers
After three decades in trucking, Harold Perry shares what he's learned about driver safety, mentorship, and helping the next generation build confidence behind the wheel.
Read More →
