Freeway Closures Coming to I-710/Long Beach Freeway
The California Department of Transportation will conduct 10 weekends of 53-hour extended closures and full freeway closures on the Long Beach Freeway (I-710) beginning August 5
The California Department of Transportation will conduct 10 weekends of 53-hour extended closures and full freeway closures on the Long Beach Freeway (I-710) beginning August 5.
The closures are part of the Long Life Pavement Rehabilitation Project from the Glenn Anderson Freeway (I-105) connector to Atlantic Boulevard in the cities of Bell, Bell Gardens, Cudahy, South Gate and Downey.
Extended weekend closures are scheduled for the following weekends:
* August: 5-8; 12-15; 19-22; 26-29
* September: 9-12; 16-19; 23-26; 30-October 3 (No construction Sept.2-5, Labor Day)
* October: 7-10; 14-17
Full freeway closures will occur in both directions and twice during each weekend on:
* Friday at 11:59 p.m. until Saturday at 6 a.m.
* And again on Sunday at 11 p.m. until Monday at 5 a.m.
Each extended weekend closure begins on Friday night at midnight with a six-hour (12:01 to 6 am) full freeway closure to install moveable median barriers.
When the freeway re-opens to traffic on Saturday at 6 a.m., the median barriers will guide all motorists to shift to the northbound side of the freeway. This allows construction crews to work on southbound I-710 and motorists to continue their commutes throughout the weekend using a reduced number of available lanes.
Then, on Sunday at 11 p.m., anther full freeway closure will be in place to remove the temporary moveable median barrier in time for the Monday morning commute.
The following ramps and connectors will be closed throughout each weekend:
* Closed on-ramps to northbound I-710: Eastbound & westbound on-ramps from Imperial Highway, Firestone Blvd. and Florence Ave.
* Closed on-ramps to southbound I-710: Eastbound & westbound on-ramps from Atlantic Blvd., Florence Ave. and Firestone Boulevard
* Closed off-ramps from southbound I-710: Eastbound & westbound off-ramps at Florence Ave. and Firestone Boulevard
* Closed Freeway Connectors: Eastbound & westbound I-105 to northbound I-710
Speed limits will be reduced to 4 5mph. No oversized loads permitted due to narrow lanes. Motorists can also expect delays. Use alternate routes and marked detours.
Closures are weather-permitting and are subject to change.
The work is part of the I-710 Long Life Pavement Project from Firestone Boulevard to Atlantic Boulevard to rehabilitate aging pavement and provide the roadway with several decades of service life, improved pavement performance and a smoother ride for the traveling public.
More Drivers

How Fraley & Schilling Improved Logbook Compliance by Over 50%
Fraley & Schilling needed a way to close a compliance workflow gap in its ELD system without adding more work from driver training, reminders, and back-office follow-ups. It found the answer in a custom driver app.
Read More →
Volvo Goes Gaming
Volvo has roared into American Truck Simulator with two new flagship trucks.
Read More →
What the Best Fleets to Drive For Teach About Driver Retention
Survey fatigue, AI-powered routing, owner-operator expectations, and the decline of social media all emerged as themes from this year's Best Fleets to Drive For program.
Read More →
Driver Retention Lessons From the Best Fleets to Drive For
What separates trucking's best workplaces from the rest? Jane Jazrawy shares the biggest lessons from this year's Best Fleets to Drive For program on driver retention, communication, AI, and workforce trends on the HDT Talks Trucking podcast.
Read More →
Farewell, CDL: Why I'm Giving Up My Commercial Driver's License
After more than 20 years as a CDL holder, HDT Executive Editor Jack Roberts is letting his commercial license expire. Not because he wants to — but because trucking's nuclear verdict crisis has made the risks of public-road test drives too great for editors, manufacturers, and everyone involved.
Read More →How Top Trucking Fleets Improve Driver Retention [Video]
What do healthy snacks, optimized routing, and just picking up the phone have in common? They're all strategies the Best Fleets to Drive For are using to retain truck drivers.
Read More →
Trucker Path Adds Verisk CargoNet Theft Data to Navigation Platform
Trucker Path’s new cargo theft risk overlays give drivers and fleets visibility into high-risk areas, stolen commodity trends, and theft hotspots.
Read More →
Netradyne Intelligence Uses New AI Agents to Automate Response to In-Cab Camera Data
The company called the next-generation in-cab camera safety platform "a fundamental shift from systems that report on what happened to systems that actively drive what should happen next."
Read More →
Why Truck Detention Keeps Costing Fleets Time and Money
A 2024 ATRI study found detention affects nearly 40% of truckload stops and costs the industry more than $15 billion annually. Despite the toll on drivers, fleets, and supply chains, the problem remains stubbornly persistent.
Read More →
Prime Inc. to Open $7.9M Flagship Used-Truck Dealership
A new driver-focused facility to sell Prime Inc's used trucks and trailers will be the first purpose-built location in the company's history.
Read More →
