Heavy Duty Trucking Logo
MenuMENU
SearchSEARCH

Virginia DOT Warns of Long Delays on I-95 Next Week

The Virginia Department of Transportation issued a notice that it will detour nighttime traffic on I-95 in Stafford County, just north of Fredericksbur

by Staff
February 24, 2005
Virginia DOT Warns of Long Delays on I-95 Next Week

 

2 min to read


The Virginia Department of Transportation issued a notice that it will detour nighttime traffic on I-95 in Stafford County, just north of Fredericksburg

, on Monday and Tuesday nights to remove the old Route 627 Bridge over the interstate. The detour will cause significant delays of at least 45 minutes. The American Trucking Assn. forwarded the Virginia press release to the association’s press contacts.
According to VDOT, construction will continue Wednesday night, with one lane closed in each direction. There will be no detour Wednesday night, but there will be delays.
The VDOT announcement included these details:
• Monday night, Feb. 28, I-95 southbound will be closed from 10 p.m. to 5 a.m. All southbound traffic will be detoured to southbound Route 1 at Exit 140 (Route 630/Stafford). Southbound delays will run from 45 to 90 minutes, barring major incidents. The length of the detour is 10 miles
• Similarly, on Tuesday night, March 1, I-95 northbound will be closed from 10 p.m. to 4:30 a.m. All northbound traffic will be detoured for 10 miles to northbound Route 1 at Exit 133 (Route 17/Falmouth). Again, delays will run from 45 to 90 minutes
• Wednesday night, March 2, one lane will be closed on both northbound and southbound I-95 from 8 p.m. to 5 a.m. The northbound lane will re-open at 4:30 a.m.
The notice said that raffic will be stopped for 10- to 15-minute intervals beginning at 10 p.m. Crews will monitor traffic flow to prevent major delays.
Motorists can also use Route 301 as an alternate route if their destination is north of the Fredericksburg region.
VDOT will use electronic message boards and Highway Advisory Radio to alert motorists of the I-95 detour and lane closures. The agency will also adjust traffic light timing on Route 1 so that traffic moves through the detour as efficiently as possible. The detour route is a four-lane roadway (two lanes in each direction) that has three traffic signals, with a signal located at the Route 630 ramp.
The project was originally scheduled to begin Feb. 14, but VDOT and its contractor; Moore Brothers Co., Inc. developed a better work plan that reduces the work from six to three nights.
For more information, go to www.VirginiaDOT.org. Click on the yellow bar on the home page for links to the detour map and project information. A direct link to the detour map is http://www.virginiadot.org/infoservice/news/i-95Detour.asp

More Drivers

Photo of Stone's Truck Stop
Driversby News/Media ReleaseFebruary 5, 2026

Trucker Path Names Top Truck Stops for 2026

Truck driver ratings reveal the best chain and independent truck stops in the country.

Read More →
SponsoredFebruary 1, 2026

Stop Watching Footage, Start Driving Results

6 intelligent dashcam tactics to improve safety and boost ROI

Read More →
DriversJanuary 23, 2026

What FMCSA’s New Enforcement Push Means for Fleets in 2026 [Podcast]

Listen as transportation attorney and TruckSafe Consulting President Brandon Wiseman joins the HDT Talks Trucking podcast to unpack the “regulatory turbulence” of last year and what it means for trucking fleets in 2026.

Read More →
Ad Loading...
DriversJanuary 20, 2026

How Pilot Is Using AI in Truck Maintenance

A practical look at how artificial intelligence is helping Pilot's trucking fleet move from reactive maintenance to a more proactive approach.

Read More →
SponsoredJanuary 19, 2026

3 New Ways Fleet Software Pays: ROI opportunities for modern fleet managers

Safety, uptime, and insurance costs directly impact profitability. This eBook looks at how fleet software is evolving to deliver real ROI through proactive maintenance, AI-powered video telematics, and real-time driver coaching. Learn how fleets are reducing crashes, defending claims, and using integrated data to make smarter operational decisions.

Read More →
SponsoredJanuary 19, 2026

Basic Tracking vs Next Generation Fleet Technology

Fleet software is getting more sophisticated and effective than ever, tying big data models together to transform maintenance, safety, and the value of your existing tech stack. Fleet technology upgrades are undoubtedly an investment, but updated technology can offer a much higher return. Read how upgrading your fleet technology can increase the return on your investment.

Read More →
Ad Loading...
Graphic showing smart truck parking technology with a highway sign reading “Spaces Available” and the Streetline logo.
Driversby News/Media ReleaseJanuary 16, 2026

Streetline Expands Smart Truck Parking System on West Coast

Streetline is expanding smart truck parking tools, including a new I-5 deployment in Washington and a no-upfront-cost pilot model for state DOTs.

Read More →
Truck parked at night
Driversby Deborah LockridgeJanuary 15, 2026

Third 'Jason's Law' Truck Parking Survey Under Way

The Federal Highway Administration is asking motor carriers and truck drivers to give input on where and when drivers have difficulty finding truck parking, and on how drivers prefer to get information on available parking.

Read More →
Driversby StaffJanuary 8, 2026

FMCSA Continues Focus on State Issuance of Non-Domiciled CDLs

The Federal Motor Carrier Safety Administration continues a crackdown on an increasing number of states it says have been issuing non-domiciled CDLs improperly.

Read More →
Ad Loading...
Driversby Deborah LockridgeDecember 30, 2025

Will FMCSA’s Driver-Oriented Enforcement Initiatives Affect Capacity?

The Department of Transportation and the Federal Motor Carrier Safety Administration took several actions in 2025 to tighten enforcement of regulations for commercial drivers. Will those affect trucking capacity in 2026?

Read More →