Previous Photo
Lead prime mover was a Kenworth C500. A T800 pushed at the back of the
Next Photo

Lead prime mover was a Kenworth C500. A T800 pushed at the back of the load. Screen capturefrom YouTube.com, Puget Sound Rail Productions.

Share:
Displaying 3 of 5