It’s easy enough to buy a battery-electric truck, but fleets are being forced to wait up to two years for their chargers. Site design, permitting, and construction take forever. Matt Horton, CEO of Voltera Power, talks to HDT Talks Trucking on how fleets can navigate these waters.
Voltera develops charging facilities for light, medium, and heavy vehicles. Horton says the upfront costs of developing charging facilities are sidelining some fleets. Others just don’t have the resources to wade through the bureaucratic swamp and get shovels in the ground.
Horton discusses the challenges and offers advice on how to get your BEV up and running as quickly as possible.
The secure and easy all-access connection to your content.
Bookmarked content can then be accessed anytime on all of your logged in devices!
Already a member? Log In
0 Comments
See all comments