Forum Mobility said its charging depot in the Port of Long Beach will be able to handle up to 200 trucks per day. The company suggests it will take about 90 minutes to charge a Class 8 truck, depending on battery size.
TeraWatt Infrastructure Breaks Ground on EV Charging Site for Port Operations
TeraWatt Infrastructure broke ground on a heavy-duty truck electric charging site that will support fleet operations at the ports of Long Beach and Los Angeles. It is expected to begin operation in mid-2024.